[Me]:- Guruji, We all know that Test activities varies with the model and also the type of project. So is there a generic list of items which we can safely follow.
[Guruji]:- Yes, You can always do it at any point when enough data is available
Requirement Phase | · Invest in analysis at the beginning of the project · Start developing the test set at the requirement analysis phase · The correctness, consistency and completeness of the requirements should be analyzed. |
Design Phase | · Analysis of design to check its completeness and consistency · Analysis of design to check whether it satisfies the requirements · Generation of test data based on design · Setting up of test bed |
Programming/Coding Phase | · Check code for consistency with design · Perform system testing in an organized manner - Buddy testing, feature testing, integration testing, System testing etc · Use available tools · Apply stress to the program · Test one at a time · Measure test coverage |
Maintenance Phase | · Retest/Regress |